NYC Renovation FAQ

The questions we hear most, grouped by topic and searchable. Can't find yours? Ask the studio.

No matching question. Ask a designer.

Process & timing

How long does an NYC apartment renovation take?

A gut renovation commonly takes 8–12 months from hiring a designer to moving in: 2–4 months of design, 2–4 months of building and DOB approvals (partly overlapping) and 4–6 months of construction. A cosmetic refresh takes 1.5–3 months.

What should I do first?

Define needs and budget before choosing a style or a contractor, then get your building's alteration rules and bring in a designer. See the 12-step process.

Can I plan a renovation before I buy?

Yes, and we recommend it. A designer can tell you whether the layout can change, how strict the building is and what it may cost — all of which affect your offer.

Should I move out during the renovation?

For gut renovations, with infants or pregnant family members, or when your only bathroom is being redone, yes. Small projects can be done while living at home.

Why are NYC renovations often delayed?

Incomplete approval packages, late materials, hidden conditions, owner changes, inspection scheduling and restricted building work hours. Plan with the timeline planner.

Budget

What does renovation cost per square foot in NYC?

As a 2026 reference, excluding kitchens and baths: about $25–90 for a refresh, $60–220 for a partial renovation and $120–420+ for a gut. All-in gut renovations commonly land around $200–600. See NYC renovation cost.

How much does a kitchen cost?

Roughly from $35k (standard) to $160k+ (luxury) for a typical apartment kitchen. Cabinets and hardware are 30–40% of it.

How much contingency should I keep?

10–15%, and 15–20% for pre-war buildings, where opening walls often reveals surprises.

How much should I budget for furniture and decor?

Commonly 20–40% of the construction budget.

How do interior designers charge?

Hourly (about $150–500), per square foot, a percentage of construction (about 10–20%), a fixed fee or a purchasing markup. Compare scope before price.

Should I take the lowest bid?

Only after adding back omissions and checking allowances and payment terms. Low bids are often recovered through change orders.

Approvals & permits

Does every apartment renovation need a DOB permit?

No. Surface-only work usually doesn't, although your building may still require an application. Changes to walls, plumbing, gas, use or egress usually do. See NYC renovation permits.

What is an Alteration Agreement?

The contract a co-op or condo requires before renovation, covering scope, hours, insurance, deposits, liability and close-out.

How long does co-op approval take?

Commonly 4–12 weeks, depending on plan review, board schedules, complexity and how complete your package is.

What is a COI?

A certificate of insurance proving the contractor's coverage, with the building's required limits and additional insureds. Have the broker send it directly.

What does "wet over dry" mean?

A common rule that bars kitchens and baths above a neighbor's living or sleeping rooms, which limits where wet rooms can move.

Can I install a washer and dryer?

It depends on the building; many older buildings prohibit them or allow only ventless dryers.

What happens if I renovate without a permit?

Violations, Stop Work Orders, costly legalization, insurance disputes and problems when selling or refinancing.

Designers & contractors

Do I need an interior designer?

Not for a small refresh. For gut renovations, layout changes, kitchens and baths, or when time is short, a designer prevents waste and rework.

How do I check a contractor's license?

Residential contractors in NYC generally need a DCWP Home Improvement Contractor license, searchable online. Plumbing, gas and electrical work require licensed masters.

How many bids should I get?

Two or three, all on the same drawings and specifications.

Do you work in Chinese?

Yes — we work in English and Chinese and can help you understand building documents, contracts and bids.

Where do you work?

The five boroughs (mainly Queens, Manhattan and Brooklyn), Long Island, Westchester and New Jersey.

Materials & systems

Solid hardwood or engineered wood?

Solid for houses with stable humidity; engineered for concrete slabs, radiant heat, wide planks and herringbone.

Quartz or sintered stone counters?

Quartz is affordable and easy to maintain but dislikes hot pans; sintered stone handles heat and scratches but has brittle edges. Heavy wok cooks often prefer sintered stone.

Which paint sheen should I use?

Flat or eggshell on walls, satin in kitchens and baths, semi-gloss on doors and trim.

How high should shower waterproofing go?

High enough to protect all wet surfaces — commonly above the shower head — with the whole bathroom floor waterproofed and flood-tested before tile.

Can I add a mini-split in an older apartment?

Often, with building approval for the outdoor unit and line set, enough electrical capacity and a condensate route.

My upstairs neighbor is loud. What can I do?

Impact noise is best treated on their floor with rugs and underlayment; a resilient ceiling on your side helps only partly.

How much extra tile or flooring should I buy?

About 7–10% for straight lay, 15% for diagonal or herringbone and 20% for complex patterns, all from one lot. Use the material estimator.

Inspection & furnishing

When should I inspect the work?

In stages: after demolition, before close-up, after waterproofing, after finishes, after installation and at completion. See the inspection guide.

When should I make final payment?

After the punch list is complete, documents and warranties are delivered and permits are signed off.

The finished home feels empty — what now?

Add rugs and curtains first, then lamps, and only then objects. See the art of soft furnishing.

How high should I hang art?

Center the artwork about 57–60 inches from the floor; over furniture, leave about 6–10 inches above the sofa back or headboard.

What color temperature should I choose?

2700–3000K for most rooms and 3000–3500K for kitchens and work areas, consistent within a sightline.

Which style suits me?

Take the style quiz and browse the twelve styles.

Begin a private consultation

Tell us about your space, your timeline and what you hope your home will feel like. The studio takes on a limited number of commissions each year and replies personally to every inquiry.