Co-op & Condo Renovation Approval: The Alteration Agreement Explained

In a New York apartment, the building's approval is often harder than the construction. Understand every clause before you sign, and prepare the package once.

Co-op & Condo Renovation Approval: The Alteration Agreement Explained

Before you renovate a co-op or condo, you need written approval from the building. The basis for that approval is the Alteration Agreement — often a long document — plus the building's alteration guidelines and house rules.

Co-op vs. condo

Co-opCondo
You ownShares + proprietary leaseThe unit itself
ApprovalsUsually stricter; the board has broad powerTypically lighter, but still required
Plan reviewOften the building's architect or engineerThe managing agent or its consultant

Starting work without approval can lead to a stop order, forfeited deposits and an order to restore.

Clauses to read closely

  1. Scope — approval covers the drawings you submitted; changes need re-approval.
  2. Work hours — commonly weekdays about 9 to 5, with tighter windows for noisy work.
  3. Summer work rule — some buildings restrict or ban renovation in summer.
  4. Wet over dry — many buildings bar kitchens and baths above a neighbor's living or sleeping rooms.
  5. Insurance — the contractor's certificate of insurance must match the building's limits and additional-insured list exactly.
  6. Deposits and fees — security deposit, plan review, managing agent and elevator fees.
  7. Completion deadline — some agreements impose per-day penalties.
  8. Owner liability — for damage to common areas and neighbors.
  9. Close-out — permit sign-offs, as-built drawings and other documents.

The typical package

DocumentPrepared by
Application and Alteration AgreementOwner
Drawings (plans, demolition, MEP)Designer / architect (sealed where a permit applies)
Contractor licenseContractor
Certificates of insuranceContractor's insurance broker
Subcontractor licenses and insurancePlumber, electrician
Asbestos reportLicensed investigator, where required
Product specsDesigner (e.g., acoustic underlayment, waterproofing)

Common sticking points

  • Sound: many buildings require acoustic underlayment under hard floors, or a minimum area of carpet. See our soundproofing notes in the FAQ.
  • Washer/dryer: older buildings may prohibit them or allow only ventless models.
  • Range hoods: most older apartments have no exterior duct; new wall penetrations are rarely approved.
  • Electrical capacity: adding induction, ovens or heat pumps may require a service evaluation.

Five ways to get approved faster

  1. Get the alteration rules before you buy.
  2. Submit a complete package — missing documents are the number-one delay.
  3. Have the broker send COIs directly, with additional insureds worded exactly.
  4. Put waterproofing, underlayment and equipment specs on the drawings.
  5. Work with the super on elevator bookings, deliveries and debris removal.

Typical review takes 4–12 weeks, plus DOB time where a permit is needed. Plan it with the timeline planner.

General renovation information only. Costs and regulations change — confirm with current official sources, your building and a licensed professional.